M30. A backlog, and room for several sessions

Package: none. The owner asked for it (2026-11-19): a better view of what is open, what the limits are, which features are missing and which could be interesting, cut so that several sessions can work on the project at the same time.

What was built

  • Known limits. Everything that is refused or done poorly today, taken from the code (93 places that refuse a problem) and from what the method pages and milestones 1 to 29 name. Each limit names the package that would lift it.

  • Backlog. All open work as about ninety packages in twelve campaigns. Each has an identifier that does not change, a size, a lane, and what it needs. The campaigns of the roadmap keep their letters, so A4, C5 and F1 mean what they meant. Five campaigns are new: H (equations in free and periodic space), J (bodies), K (input, output and plots), L (trust) and P (the project itself).

  • Ideas. Features that are not packages yet, by size.

  • The roadmap keeps the campaigns and the reasons, and leaves the lists to the three pages above.

  • Rules for several sessions, in the workflow, and in CLAUDE.md.

  • Small changes that keep sessions apart. The benchmark suite takes --add, which writes the timings of new cases and leaves the others. The list of cases in threads_tests.rs is a sorted slice, not an array of a fixed length. The gallery no longer counts its problems.

  • Statements that had gone stale in the history, the roadmap, the page of capabilities, the benchmarks and four method pages.

Decisions

D30.1. Open work is kept as packages, on three pages

Developer, 2026-11-19, on the owner’s request.

The roadmap listed what was open as prose, by topic. That served one developer who knew the code. It does not say how large a piece of work is, what it needs, or whether two pieces can be done at once.

  • Known limits is the view of a user: what does not work.

  • Backlog is the view of the developer: what there is to do. A package has an identifier (the letter of its campaign and a number), a size (S, M, L), a lane, and what it needs.

  • Ideas holds what is not yet a package.

A package that is done is removed from the backlog. The backlog holds no status: who works on what is the list of open pull requests (D30.2).

The pages overlap with What pdemagic solves on purpose. That page is for a user who wants to know in a minute whether a problem is covered. The limits are complete.

D30.2. Sessions coordinate through pull requests, and work in lanes

Developer, 2026-11-19, on the owner’s request.

Sessions share nothing but the repository on GitHub, and no session may push to main. So a claim cannot be a file in the repository: it would be visible to others only after a merge.

  • A claim is a pull request, opened as a draft before the work starts, with the package and the milestone number in its title. Of two that claim the same, the one with the lower number keeps it. GitHub assigns these numbers in order, and each session looks after it has opened its own, so exactly one of two yields.

  • A lane is the part of the code where a package does most of its work. One session works in a lane at a time. The lanes follow the modules, not the campaigns: A19 (vacuum outside on the new grids) belongs to boundaries and is in the lane of the stationary solvers.

  • Shared files have rules, listed in the workflow. The one that matters most is D30.3.

Rejected: a file of claims in the repository (visible only after a merge), a branch as the claim (two branches with the same number can both be pushed, and nothing orders them), and letting the owner hand out numbers (the owner would become the lock).

D30.3. Each milestone keeps its own record, and numbers its decisions

Developer, 2026-11-19.

Until now every milestone appended to history.md and to decisions.md, and took the next number for each decision. Two milestones in work at the same time would collide in both files, and would take the same numbers, which code and pages already refer to before a merge.

From milestone 30 on:

  • A milestone writes docs/dev/milestones/m<N>-<slug>.md: what was built, the decisions, what was left for later.

  • Its decisions are numbered D<N>.1, D<N>.2, and so on.

  • history.md (milestones 1 to 29) and decisions.md (D1 to D79) are closed. Their entries stand, and are referred to as before.

The number of the milestone is the one thing that must not collide. The claim of D30.2 settles it.

Known cost: what is decided is no longer on one page. A session reads decisions.md, and then the records of the milestones.

D30.4. Work that is recorded is a milestone

Developer, 2026-11-19.

Pull requests that built no feature (the website, the README) had no number, and recorded their decisions in decisions.md. With that file closed, any work that takes a decision or changes how the project is described gets a milestone number and a record. This one is the first.

Left for later

  • The settings of the repository that would enforce the rules: for the owner, in the workflow.

  • The claim was tried once, by this milestone: its pull request was opened as a draft, which the repository allows. Two sessions that claim at the same moment have not met yet.

  • The backlog was cut by one reading of the code. Sizes are estimates, and large packages are to be cut again by whoever takes them.