# The project How pdemagic is built, what is decided, and where it is heading. These pages are the memory of the project. They are written for the people who work on it, and say more than a user needs. - [Architecture](architecture.md): the crates, the modules, and how a problem passes through them. - [Roadmap](roadmap.md): where the project stands and what comes next. - [Backlog](backlog.md): all open work, as packages. - [Ideas](ideas.md): what might be worth doing, not yet planned. - [History](history.md) and the [records of the milestones](milestones/index.md): what was built, and why so. - [Decisions](decisions.md): what is settled. - [Workflow](workflow.md): how the work is done and checked. - [Benchmarks](benchmarks.md): what is measured. - [Discretizations for general shapes](shapes.md): the study behind the shapes in the plane. What does not work yet is part of the reference: [known limits](limits.md). ```{toctree} :hidden: :maxdepth: 1 architecture roadmap backlog ideas history decisions milestones/index workflow benchmarks shapes ```